work site locator

Samples of jobs presented on elevation

– Derrick-man Escape System
– Fall Arrest Support Frame
– Stab Master
– Tong Back Up System
– Derrick Track Repair / Strengthening
– Top Drive Dolly Repair / Strengthening
– New Mouse Hole
– Pipe Handling
– Dead Man Anchor Repair
– New Raw Water Tower
– Fitness for Purpose Hull Wastage
– New Texas Deck
– Cantilever Asst / Strengthening
– Conductor Support System
– Spud can / Leg Fitness for Purpose
– Ballast to Brine Tank Conversion
– Portable Tank Repair
– Repair Sequence
– New Elevator
– Submersible Mud Pomp
– Draft Sensor and Hydrophone Cofferdam
– Thruster Wall Blanking


Active Heave Platform Derrick-man Escape System Stand Pipe Verification Derrick Global Analysis New Mouse Hole JACK UP
a. New Raw Water Tower
b. Fitness for Purpose Hull Wastage
c. New Texas Deck
d. Cantilever Asst / Strengthening
e. Conductor Support System
f. Spud can / Leg Fitness for Purpose
g. Ballast to Brine Tank Conversion
Potable Tank Repair Draft Sensor and Hydrophone Cofferdam Thuster Well Blanking Thruster Compartment Leak Isolation Sea Chest, On Location Blanking Wave Damage Repair
– Active Heave Platform
– Crown Removal Frame
– Block Hang off Padeye
– Drill Line Hang off Beam
– Ladsaf System
– Stand Pipe Verification
– Wire Line Bridle Anchor
– Derrick Global Analysis
– Substructure Analysis
– Tensioner Upgrade
– Derrick Wastage, Fitness for Purpose Assessment
– Wave Damage Repair
– Accidental Damage Verification
– Sea Chest, On Location Blanking
– Thruster Compartment Leak Isolation

Samples of jobs presented on plan

– Flare Boom Re-Analysis
– Flare Boom Modification
– Flare Boom Repair
– ROV Launch Recovery
– Current Metre Installation
– New Lifeboat Installation
– Global Assessment of Lifeboat Platform
– Poop Deck Verification
– Angel Wing Upgrade


Flare Boom Re-Analysis ROV Launch Recovery New Lifeboat Installation Angel Wing Upgrade Deck Strengthening Helideck Strength Verification New Accommodation Chain Hang off Plate New Crane Installation
– New Crane Installation
– Accident Repair to Boom
– Accident Repair to A-Frame
– New Boom Rest Design
– Boom Rest Fitness for Purpose Analysis
– Helideck Strength Verification
– Helideck Upgrade
– New Helideck
– Fitness for Purpose, Wastage Check
– CAP 437 Screening
– New Accommodation
– New HVAC Structure
– Deck Strengthening
– Equipment Management
– Coil Skid, Wire Line, Schlumberger Platform, TWMA, Fract, Frame, Centrifuge Installation, Shaker, Cement Unit, Generator Removal
– Chain Hang off Plate

Samples of jobs presented on bottom plan

– Fairlead Repair
– Corrosion Fitness for Purpose
– Corrosion Repair
– Fatigue Crack, Hole Repair
– S. W. I. S.
– Bulk Tank Fitness for Purpose


Fairlead Repair Corrosion Fitness for Purpose Fatigue Crack, Hole Repair Bulk Tank Fitness for Purpose On Location Tank Repair Boat Contact Damage Repair Double Bitt Verification Dry Tow Verification Tubular Bracing Accidental Boat Contact Shipboard Piping System Verification
– Shipboard Piping System Verification
– Tubular Bracing Accidental Boat Contact
– Dry Tow Verification
– On Barge Cribbing
– Double Bit Verification
– Boat Contact Damage Repair
– On Location Tank Repair
– Tank Wall Strengthening